Genesis Energy Waste Minimisation

 

Wilkinson Environmental Ltd developed and implemented a waste minimisation programme for Genesis Energy sites throughout the North Island between 2007 and 2012.   Our annual waste audits and minimisation advice provided the basis for Genesis Energy annual environmental reporting on waste minimisation.

We helped sites to achieve real savings, including an 83% reduction in waste at Genesis head office in Auckland, and opportunities for more than 50% reduction at energy generation sites, including Huntly Power Station.